Causes Of Delay And Cost Overrun In Malaysian Construction Industry

M. M. Tahir, Nuzul Azam Haron, A. Alias, Ikechukwu A. Diugwu
Published 2017 · Business

Cite This
Download PDF
Analyze on Scholarcy
Share
The construction industry in Malaysia drives the economic growth and development of the country. However, the industry is plagued with delays and cost overrun which transforms what should have been successful projects to projects incurring additional costs, disagreements, litigation and in some cases abandonment of projects. This research studied the causes of delays and cost overrun in the industry and ranked them according to their perceived importance to the contractors, with a view to establishing those to be addressed by the contractors. Online questionnaires were used for data collection for this research. A total of 69 responses were analysed using principal component analysis (PCA) (factor analysis) to identify the main causes. The result of the analysis showed that delay in preparation of design document, poor schedule and control of time, delay in delivery of material to site, lack of knowledge about the different defined execution methods, shortage of labour and material in market, and changes in scope of work were the main causes of delay and cost overrun. The identified causes if properly addressed would reduce the rate of delays and cost overrun in construction projects, thus enhancing the economic growth and development of the country.
This paper references
10.1108/13664380910977592
Delays and cost overruns in the construction projects in the Gaza Strip
A. Enshassi (2009)
10.1109/CHUSER.2012.6504280
Time and cost performance of costruction projects in southern and cenrtal regions of penisular Malaysia
I. A. Rahman (2012)
10.1016/J.IJPROMAN.2006.11.007
Causes and effects of delays in Malaysian construction industry
M. Sambasivan (2007)
10.1016/S0263-7863(00)00032-6
Compressing construction durations: lessons learned from Hong Kong building projects
D. W. Chan (2002)
10.1016/J.IJPROMAN.2008.07.003
Cost escalation and schedule delays in road construction projects in Zambia
Chabota Kaliba (2009)
10.1016/S0263-7863(98)00060-X
Construction delay: a quantitative analysis
Ayman H. Al‐Momani (2000)
10.1061/(ASCE)0733-9364(2001)127:5(374)
Comparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM)
R. A. Yamin (2001)
10.1108/JFMPC-04-2013-0009
Factors contributing to project time and hence cost overrun in the Malaysian construction industry
Zayyana Shehu (2014)
10.1108/09699980710731308
The significant factors causing delay of building construction projects in Malaysia
Wa'el Alaghbari (2007)
10.1061/(ASCE)0733-9364(2008)134:11(831)
Causes of Delay in Building Construction Projects in Egypt
M. A. El-Razek (2008)
Project Management Development in Malaysia : A case study
S. N. Ting (2004)
10.1016/S0263-7863(96)00039-7
A comparative study of causes of time overruns in Hong Kong construction projects
D. W. Chan (1997)
10.1201/9780203023426.ch7
Virtual building environments (VBE) - Applying information modeling to buildings
V. Bazjanac (2004)
10.1061/(ASCE)0733-9364(1991)117:3(486)
Cost‐ and Schedule‐Control Integration: Issues and Needs
W. Rasdorf (1991)
Project planning and control
D. Carmichael (2006)
10.1080/014461997373132
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
Peter F. Kaming (1997)
10.1061/(ASCE)CO.1943-7862.0000746
Comparison of Cost and Time Performance of Design-Build and Design-Bid-Build Delivery Systems in Florida
R. E. Minchin (2013)
10.19026/RJASET.8.1012
BIM in Malaysian Construction Industry: Status, Advantages, Barriers and Strategies to Enhance the Implementation Level
A. H. Memon (2014)
10.1080/01446190801905406
Problems causing delays in major construction projects in Thailand
S. Toor (2008)
10.1080/01446199300000017
Research on construction industry development at the crossroads
G. Ofori (1993)
10.1080/01944360208976273
Underestimating Costs in Public Works Projects: Error or Lie?
B. Flyvbjerg (2002)
10.4028/www.scientific.net/AMR.452-453.1002
Analysis of Time and Cost Overrun in Malaysian Construction
Chidambaram Ramanathan (2012)
10.1080/01446191003674519
Cost and time control of construction projects: inhibiting factors and mitigating measures in practice
Y. Olawale (2010)
10.1016/J.IJPROMAN.2011.12.001
Contractors' perception of the use of costs of quality system in Malaysian building construction projects
S. Al-Tmeemy (2012)
10.1080/01446199100000003
Programmes for improving the performance of contracting firms in developing countries: A review of approaches and appropriate options
G. Ofori (1991)
10.1016/J.IJPROMAN.2011.10.004
Analysing factors affecting delays in Indian construction projects
H. Doloi (2012)



This paper is referenced by
Semantic Scholar Logo Some data provided by SemanticScholar