Online citations, reference lists, and bibliographies.
← Back to Search

Critical Success Factors And Dynamic Modeling Of Construction Labour Productivity

S. Palikhe, Sunkuk Kim, Joseph J. Kim
Published 2019 · Business

Save to my Library
Download PDF
Analyze on Scholarcy Visualize in Litmaps
Share
Reduce the time it takes to create your bibliography by a factor of 10 by using the world’s favourite reference manager
Time to take this seriously.
Get Citationsy
Poor construction labour productivity is a major issue within the construction industry because it directly contributes to cost and schedule overrun. Although considerable research has been done on labour productivity factors, few studies have researched construction labour productivity in developing countries. Therefore, in consideration of improving productivity, a questionnaire survey was conducted with construction practitioners involved in the Nepalese construction industry to identify critical factors and to examine the underlying relationships among these factors using fuzzy analytical hierarchical process. The results show that the most critical factors for poor labour productivity are lack of monetary incentive, tools unavailability, insufficient periodic meetings, and unsafe working conditions. The top-ranked factors were compared to those obtained from other countries. The causal relationship diagram and system dynamic models were constructed to examine the inter-relationship between the perceived 30 factors and four criteria to identify the root cause of a decrease in productivity. The system dynamic models will help researchers determine the productivity growth rate in terms of cost and time, and policy makers to revise policies so that the decision maker can draw upon the policy process and its implications. The results not only coincide with the existing body of knowledge on the labour productivity improvement, but also contribute to the growing body of the construction labour productivity research by providing an evaluation method for multi-criteria decision making.
This paper references
Readings in the analysis of survey data
R. Ferber (1980)
10.1080/01446199000000005
Research of factors influencing construction productivity
Z. Herbsman (1990)
10.1061/(ASCE)0733-9364(1994)120:1(47)
Action-Response Model and Loss of Productivity in Construction
David W. Halligan (1994)
10.5860/choice.33-2786
Fuzzy sets and fuzzy logic - theory and applications
G. Klir (1995)
10.1016/0377-2217(95)00300-2
Applications of the extent analysis method on fuzzy AHP
Da-Yong Chang (1996)
10.1080/014461997373132
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
Peter F. Kaming (1997)
10.1016/S0360-1323(96)00044-3
Factors affecting the motivation of Iranian construction operatives
M. Zakeri (1997)
10.1016/0165-0114(85)90090-9
Fuzzy hierarchical analysis
J.J. Buckley (1999)
10.1061/(ASCE)0733-9364(2002)128:2(103)
Assignment and Allocation Optimization of Partially Multiskilled Workforce
J. Gomar (2002)
10.1061/(ASCE)0733-9364(2002)128:4(331)
Benchmarking Productivity Indicators for Electrical'Mechanical Projects
A. Hanna (2002)
10.1108/02630800510586907
Factors affecting construction labour productivity for Malaysian residential projects
M. R. A. Kadir (2005)
10.1016/J.AUTCON.2004.09.006
Automated project performance control of construction projects
R. Navon (2005)
10.1002/NUR.20147
The content validity index: are you sure you know what's being reported? Critique and recommendations.
D. Polit (2006)
10.1007/BF02824057
Critical construction conflicting factors identification using analytical hierarchy process
N. Acharya (2006)
10.1080/13923730.2007.9636444
FACTORS AFFECTING LABOUR PRODUCTIVITY IN BUILDING PROJECTS IN THE GAZA STRIP
A. Enshassi (2007)
10.1080/13923730.2007.9636434
Factors affecting the productivity of building craftsmen ‐ studies of Uganda
H. Alinaitwe (2007)
10.3846/1392-3730.2009.15.269-280
Factors affecting the performance of construction projects in the Gaza Strip
A. Enshassi (2008)
10.1108/17410401011006095
Modelling construction project productivity using systems dynamics approach
M. Mawdesley (2009)
10.1061/(ASCE)CO.1943-7862.0000274
Analysis of Factors Influencing Productivity Using Craftsmen Questionnaires: Case Study in a Chilean Construction Company
Rodrigo A. Rivas (2011)
10.1080/15623599.2012.10773182
Construction and Economic Development: The Case of Malaysia
F. C. Chia (2012)
10.1061/(ASCE)CO.1943-7862.0000501
Factors Affecting Construction Labor Productivity in Kuwait
A. M. Jarkas (2012)
10.1080/15623599.2012.10773192
A Survey of Factors Influencing the Productivity of Construction Operatives in the State of Qatar
A. M. Jarkas (2012)
10.3846/20294913.2012.661203
A survey of the factors affecting the productivity of construction projects in Iran
P. Ghoddousi (2012)
10.1504/IJPQM.2013.056736
Productivity determinants in Oman construction industry
Md. Anisul Islam (2013)
10.1080/15623599.2013.10878231
Critical Analysis of the Key Factors Affecting Construction Labour Productivity –An Indian Perspective
Anu V. Thomas (2013)
10.1061/(ASCE)ME.1943-5479.0000168
Factors Influencing Construction Labor Productivity in Egypt
K. M. El-Gohary (2014)
10.1002/PMJ.21466
From the Editor: Project Management as a Behavioral Discipline and as Driver of Productivity and Innovations
H. G. Gemuenden (2014)
Critical Factors which Govern Labour Productivity in Building Construction Industry in Sri Lanka
R. Halwatura (2015)
10.1080/15623599.2015.1012143
Factors influencing labour productivity in Bahrain's construction industry
Abdulaziz M. Jarkas (2015)
10.1080/15623599.2016.1142266
Factors affecting construction labour productivity: a case study of Jordan
M. Hiyassat (2016)
10.1061/9780784480502.069
Increasing the Productivity of a Construction Project Using Collaborative Pull Planning
Somik Ghosh (2017)
10.1061/(ASCE)CO.1943-7862.0001257
Optimal Productivity in Labor-Intensive Construction Operations: Pilot Study
K. Kisi (2017)



This paper is referenced by
Semantic Scholar Logo Some data provided by SemanticScholar