Online citations, reference lists, and bibliographies.
← Back to Search

Integer Programming Formulations For The Multi-depot Vehicle Routing Problem: Comments On A Paper By Kulkarni And Bhave

G. Laporte
Published 1989 · Computer Science

Save to my Library
Download PDF
Analyze on Scholarcy Visualize in Litmaps
Share
Reduce the time it takes to create your bibliography by a factor of 10 by using the world’s favourite reference manager
Time to take this seriously.
Get Citationsy
This paper references



This paper is referenced by
10.3934/NACO.2017029
A hybrid meta-heuristic algorithm to minimize the number of tardy jobs in a dynamic two-machine flow shop problem
M. A. Ardakan (2017)
10.5267/J.USCM.2016.3.001
Vehicle routing problem with considering multi-middle depots for perishable food delivery
Masoud Rabbani (2016)
10.1007/s10951-013-0336-y
Two-machine interval shop scheduling with time lags
X. Zhang (2015)
10.1016/j.cie.2014.10.029
A literature review on the vehicle routing problem with multiple depots
J. Montoya-Torres (2015)
10.1080/0951192X.2013.820349
A branch-and-bound algorithm for minimising the number of tardy jobs in a two-machine flow-shop problem with release dates
M. A. Ardakan (2014)
10.1002/9781118731598.CH4
A Comparison of Local Search Metaheuristics for a Hierarchical Flow Shop Optimization Problem with Time Lags
Emna Dhouib (2013)
10.7307/PTT.V25I6.1296
The Case Study of Implementing the Delivery Optimization System at a Fast-Moving Consumer Goods Distributer
A. Galic (2013)
10.1007/S00170-012-4328-4
Stochastic flow-shop scheduling with minimizing the expected number of tardy jobs
Ali Elyasi (2013)
10.1007/s10852-012-9180-x
Minimizing the Number of Tardy Jobs in a Permutation Flowshop Scheduling Problem with Setup Times and Time Lags Constraints
Emna Dhouib (2013)
10.1007/S00170-011-3659-X
No-wait flowshop scheduling problem to minimize the number of tardy jobs
Tariq A. Aldowaisan (2012)
10.1080/00207543.2011.632385
Sequence-dependent flow shop scheduling problem minimising the number of tardy jobs
M. Varmazyar (2012)
10.3846/13923730.2012.719837
Applying metaheuristic strategies in construction projects management
W. Bozejko (2012)
10.1016/j.cor.2009.04.018
Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility
A. Ruiz-Torres (2010)
10.1016/j.cor.2006.07.013
Minimizing the number of late jobs for the permutation flowshop problem with secondary resources
A. Ruiz-Torres (2008)
10.1016/J.IJPE.2008.04.011
Scheduling identical parallel machines to minimize total tardiness
D. Biskup (2008)
10.1016/j.ejor.2005.03.008
Integer linear programming formulations of multiple salesman problems and its variations
I. Kara (2006)
10.1007/11424925_38
An Exact Algorithm for Multi Depot and Multi Period Vehicle Scheduling Problem
Kyung Hwan Kang (2005)
10.1016/S0377-2217(03)00434-X
A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation
S. Bertel (2004)
10.1016/S0377-2217(03)00404-1
A new rule for minimizing the number of tardy jobs in dynamic flow shops
Emmett J. Lodree (2004)
A Review of Current Status and Analysis in Supply Chain Modeling
Kyung Hwan Kang (2004)
10.1016/S0305-0548(02)00114-4
Minimizing the weighted number of tardy jobs on a two-machine flow shop
R. L. Bulfin (2003)
10.1080/10170660109509466
SCHEDULING OPEN SHOPS TO MINIMIZE TOTAL WEIGHTED TARDINESS
C. Liaw (2001)
A Home Health Care Routing and Scheduling
ProblemEddie Cheng (1998)
10.1016/S0377-2217(98)00323-3
On the complexity of two-machine flowshop problems with due date related objectives
Christos Koulamas (1998)
10.1007/978-1-4613-0303-9_25
A Review of Machine Scheduling: Complexity, Algorithms and Approximability
B. Chen (1998)
10.1023/A:1018552119403
Production scheduling in almost continuous time
K. R. Gue (1997)
10.1016/0305-0548(94)00074-I
Using the Miller-Tucker-Zemlin constraints to formulate a minimal spanning tree problem with hop constraints
L. Gouveia (1995)
10.1016/0305-0548(94)90040-X
A new node selection strategy in the branch-and-bound procedure
C. Liao (1994)
10.1007/978-3-642-87729-2_7
Überblick über anwendungsbezogene Veröffentlichungen
Dipl.-Math. Dr. rer. nat. Kurt Littger (1992)
Semantic Scholar Logo Some data provided by SemanticScholar